Broadway bus stand to become ₹822.7 crore transport hub
In January 2026, the historic Broadway bus stand was reported as becoming a ₹822.7 crore multimodal hub with 73 bus bays.
The historic Broadway bus stand is being redeveloped into a ₹822.7 crore multimodal transport hub with bus and commercial facilities.

Broadway bus stand to become ₹822.7 crore transport hub — Mobility, Chennai local news
Story type
Civic / development news
Neighbourhood or area
Broadway / George Town / North Chennai
Published source date
30 January 2026
Event date
January 2026
Category
Mobility
Verification status
Based on cited source; missing official figures are marked [unconfirmed]
What we know
Summary
Broadway, January 2026 — The historic Broadway bus stand is being redeveloped into a ₹822.7 crore integrated multimodal transport hub.
Key facts
| Item | Detail |
|---|---|
| Project | Broadway multimodal transport hub |
| Reported cost | ₹822.7 crore |
| Main components | Nine-storey bus terminal, 10-storey commercial complex |
| Bus bays | 73 |
| Parking | 433 cars and 1,174 two-wheelers |
| Neighbourhood | Broadway / George Town |
What happened
- The project will replace the old Broadway bus stand with a modern integrated facility.
- The source says the facility will include passenger concourse, office and retail spaces.
- The design is meant to separate passenger movement from bus operations.
- The redevelopment is part of wider transport infrastructure upgrades in North Chennai.
Sources
- Primary source: The Times of India report
What this means in Chennai
Local impact, institutions, and what residents should watch next.
Why Chennai readers should care
Broadway is one of Chennai’s most important legacy bus nodes. A modern terminal can reduce crowding, improve passenger safety and support better transfers.
The project matters to daily wage workers, students and central-city commuters who depend heavily on MTC services.
Commercial development can help fund maintenance, but public movement, bus priority and affordable commuter access should remain the core design test.
What changes for citizens
- Check temporary bus arrangements before travelling through Broadway during construction.
- Watch whether routes are shifted to Royapuram, Island Grounds or other holding points.
- Track pedestrian safety near construction barricades.
- After opening, check whether the hub connects smoothly to High Court Metro and nearby suburban rail.
Related reading on mychennaicity.in
Editorial note
This article is suitable as a development explainer. Add official construction-stage updates when GCC or CMDA releases them.
Official sources
This page is an editorial rephrase and analysis based on publicly reported information. Read the original source for full context.
Promote your business to Chennai readers
Get visibility across local news, events, jobs and area pages.
Reader group: The my chennai city reader group — short updates and civil discussion, same standards as the site. Opens WhatsApp after you tap.
Tip the Chennai desk
Spotted something we should look at — safety, civic works, consumer rip-offs, or a human story? A short message is enough; links and dates help.



